Skip to main content

Municipal Court & Police Records is moving to new locations

Important Dates: 

  • March 19 - Police Records Reopens (17221 E. 23rd St. S.) | Last day at 223 N. Memorial Dr. - March 9
  • March 23 - City Council Study Session at IMC (20201 E. Jackson Dr.) | Last day at 111 E. Maple Ave. - March 20
  • March 30 - Municipal Court Reopens (223 N. Memorial Dr.) | Last day at 111 E. Maple Ave. - March 13

More details: independencemo.gov/imc

The Emergency Stormwater Project addresses a number of small stormwater projects annually which generally require little to no engineering design. These projects are addressed as failures in the storm water infrastructure arise. 

Located in the Rock Creek Watershed, this project addresses residential flooding. Storm drainage improvements in this Rock Creek Neighborhood will mitigate flooding of homes with this installation of over 1,000 feet of storm lines. 

This neighborhood project will address undersized stormwater systems at various locations in the Sugar Creek Watershed

Located in the Crackerneck Watershed, this project consists of the design and installation of drainage inlets, pipes, and channels from 23rd Street southeast to Crane Street at Hereford Avenue. Originally planned for two phases, this has now been combined into one project. 

Located in the Rock Creek Watershed this project consists of the design and construction of drainage improvements along the creek from E. 28th Street to E. 25th Street, east of Hardy. Undersized culverts, eroded streambanks, and deteriorated storm drainage facilities have resulted in the need for over 3,500 feet of improvements in this residential neighborhood.